Who we are

A mid-tier operator that still runs its own pits.

Ironbark Resources holds and operates three metallurgical coal tenements between Moranbah and Blackwater. We plan the mine, run the fleet, wash the product and manage our own rail and port allocation — the whole chain sits under one management team in Mackay.

That matters when you’re committing to a supply agreement, a joint venture, or a multi-year contract. Decisions about production, blending and scheduling are made by people you can get on the phone, not a head office in another hemisphere.

Operations

Three sites, one corridor.

An ultra-class haul truck on a black coal bench in the Warrigal Creek open cut
Producing

Warrigal Creek

Open-cut truck and shovel, 18 km north-west of Moranbah. Hard coking coal, 5.1 Mtpa ROM through an on-site CHPP.

Open cut · Hard coking
The concrete portal of the Mundoo Range underground mine set into a coal highwall
Producing

Mundoo Range

Single longwall underground with two development units. PCI and semi-hard product, 4.3 Mtpa ROM, railed from Coppabella.

Underground · PCI
An exploration drill rig on a cleared pad at Cardowan South, core trays laid out beside it
Feasibility

Cardowan South

Advanced exploration south of Blackwater. Definitive feasibility under way, with first coal targeted for the back half of the decade.

Study · Coking
Capabilities

Pit to port, under one roof.

01

Mine planning & geology

In-house resource modelling, pit design and life-of-mine scheduling across all three tenements.

02

Open-cut mining

Owner-operated truck and shovel fleet, drill and blast, and an integrated overburden removal program.

03

Underground longwall

Longwall extraction with continuous miner development, full gas drainage and ventilation management.

04

Processing & blending

Two coal handling and preparation plants, with blending to customer specification before train load-out.

05

Rail & port logistics

Contracted capacity on the Goonyella and Blackwater systems with allocation through Dalrymple Bay.

06

Contract & supply management

Long-term offtake, spot tonnage and joint venture arrangements handled by our commercial team in Brisbane.

Safety & compliance

Everyone goes home the way they arrived.

Our safety and health management system is built to the Queensland Coal Mining Safety and Health Act 1999 and audited annually against ISO 45001. Site senior executives hold statutory accountability at each operation, and every contractor works to the same standard we hold ourselves to.

0.94

TRIFR, rolling 12 months

100%

Contractor inductions

4.1m

Hours worked, FY25

Six mine workers in hi-vis shirts and white hard hats at a pre-start meeting beside a haul truck
Supplying and partnering with
Kaiyo Steel Works
Tidewater Port Services
Northgate Rail
Seoyang Metals
Brigalow Engineering
Certification
Memberships
Recognition

Got a project, a tender or a tonnage requirement?

Tell us what you need and the right person will come back to you — usually inside two business days.

Scroll to Top