Operations

Two producing mines and one advanced study, all within the Bowen Basin.

Our tenements sit on established rail corridors to Dalrymple Bay and Gladstone, which keeps logistics predictable and product quality consistent shipment to shipment.

Conveyors and a stacker building a black coal stockpile at the Warrigal Creek preparation plant
Producing

Warrigal Creek

A conventional truck and shovel open cut 18 km north-west of Moranbah, in production since 2011. Coal is washed on site and railed to Dalrymple Bay on the Goonyella system. The pit has a 24-year reserve life at current rates, with a northern extension approved and scheduled to start stripping next year.

Product
Hard coking
ROM
5.1 Mtpa
Workforce
410
Reserve life
24 years
Producing

Mundoo Range

A single-longwall underground operation with two continuous miner development units, commissioned in 2018. Pre-drainage and goaf gas management run ahead of the face, and product is blended with Warrigal Creek tonnage at the Coppabella load-out to hold a consistent PCI specification.

A mining machine working under lights at the end of an underground roadway at Mundoo Range
Product
PCI / semi-hard
ROM
4.3 Mtpa
Workforce
330
Reserve life
17 years
Trays of black coal drill core on a trestle table beside a clipboard and a rock hammer
Feasibility

Cardowan South

An advanced exploration project south of Blackwater, acquired in 2021. Resource definition drilling is complete and a definitive feasibility study is under way, covering an open cut starter pit with underground potential at depth. Environmental authority and water approvals are in assessment.

Target product
Coking
Stage
DFS
Tenement
EPC 2214
First coal
Targeted 2029
Infrastructure

Rail and port capacity already contracted.

Above-rail haulage is contracted on the Goonyella and Blackwater systems, with terminal allocation at Dalrymple Bay and access arrangements at RG Tanna. Train load-outs at Coppabella and on-site at Warrigal Creek give us two independent paths to water.

Rail systems
Goonyella · Blackwater
Terminals
Dalrymple Bay · RG Tanna
Load-outs
Coppabella · Warrigal Creek
CHPP capacity
1,800 tph combined
Scroll to Top